HomeNew Build Defect Repair Costs

London Repair Costs · 2026

New Build Defect Repair Costs
What Every Snag Actually Costs to Fix

Most snagging companies give you a list of defects. We give you the list and what each defect is worth in pounds — using current London contractor rates. Because knowing that the developer owes you £7,400 in remedial work is a very different conversation from knowing you have 60 snags.

40–90
Avg defects per flat
£3k–12k
Typical repair value
5%
Defects developers fix

Why repair costs matter more than a defect count

A snag list with 70 items is useful. A snag list with 70 items and a total remediation cost of £9,200 is a legal document.

Developers respond to financial exposure. When you submit a formal complaint backed by a costed report, the developer's customer care team — or their legal team — has a number to work with. That number either becomes a repair schedule or a negotiating figure. Either outcome is better than a snag list they can dismiss as subjective.

Our Money Report gives you exactly that. Every defect is listed, photographed, priority-rated, and costed at current London contractor rates. It is the report we would want if we were buying a new build flat.

London repair cost reference — 2026

Mid-market London contractor rates. Actual costs vary by borough, contractor, and extent of damage. These are the rates we use in our Money Reports.

Doors & Frames

DefectLowHigh
Front door replacement (fitted)£400£800
Internal door replacement (fitted)£400£600
Door frame realignment£150£300
Lock cylinder replacement£80£150
Missing door stopper (per door)£15£30

Walls & Ceilings

DefectLowHigh
Hairline crack repair (per crack)£50£150
Structural crack investigation£300£800
Full room repaint (labour + materials)£350£700
Ceiling water stain repair + repaint£200£500
Plasterwork skim (per wall)£200£400

Windows

DefectLowHigh
Failed sealed unit replacement (per pane)£150£350
Full window replacement£1,500£3,000
Window mechanism repair£80£200
Frame seal replacement£100£250

Bathroom & Plumbing

DefectLowHigh
Silicone reseal (bath or shower)£100£200
Toilet replacement (wall-hung, fitted)£500£900
Drain unblock£150£300
Plumber call-out (per hour)£100£150
Leak investigation + repair£300£800
Professional bathroom deep clean£250£400

Kitchen

DefectLowHigh
Kitchen cabinet door replacement (per door)£80£200
Worktop replacement (per metre)£200£500
Hob replacement (fitted)£250£600
Oven replacement (fitted)£300£700
Fridge/freezer replacement£300£700
Dishwasher reconnection£100£200
Full kitchen replacement£5,000£15,000

Flooring

DefectLowHigh
Carpet replacement (per room)£400£900
LVT/laminate replacement (per room)£800£1,800
Engineered wood repair/replacement (per room)£1,000£2,500
Subfloor levelling (per room)£300£700

Electrics & Heating

DefectLowHigh
Electrical investigation (per circuit)£150£300
Full flat rewire£3,000£6,000
Light fitting replacement (per fitting)£50£150
Boiler service + pressure reset£100£200
Boiler replacement (combi, fitted)£2,000£3,500
Radiator valve replacement£80£180
Underfloor heating fault diagnosis£200£500

Ventilation & Damp

DefectLowHigh
Ventilation system repair£200£600
Ventilation unit replacement (MVHR)£1,500£3,000
Mould treatment (professional)£200£600
Full mould remediation (extensive)£1,000£5,000

All costs are London mid-market estimates for 2026, inclusive of labour and standard materials. Costs may vary significantly based on access, extent of damage, and contractor availability.

Our Money Report

Get a costed snag list for your flat

The Money Report includes everything in a standard inspection — full room-by-room defect survey, photos, priority ratings — plus a repair cost estimate for each defect at current London contractor rates.

Full snagging inspection
Defect photos + priority ratings
Repair cost per defect
Total remediation value
Report delivered in 24 hours
Pre-handover briefing call

Which defects are worth fighting for?

Not every defect is equal. Some the developer is legally obligated to fix. Others are cosmetic and harder to enforce. Our reports categorise every defect so you know exactly where to spend your energy.

Building Regulations failures

Ventilation not working, electrical faults, structural cracks. Developer has no legal defence. These must be fixed.

NHBC warranty items

Structural defects covered for 10 years. Failed sealed units, subsidence, roof defects. Report in writing.

New Homes Quality Code breaches

Developer committed to fix minor defects within 30 days. Cosmetic damage, missing items, incomplete finishes.

Cosmetic defects

Scratches, paint runs, minor gaps. Technically the developer's responsibility before completion. Leverage drops once you're in.

Frequently asked questions

Who is responsible for fixing defects in a new build?

The developer is responsible for defects during the first 2 years from legal completion — this is the defect liability period. After that, structural defects are covered by the NHBC Buildmark warranty for up to 10 years. Cosmetic defects (poor paintwork, scratches) are technically the developer's responsibility but much harder to enforce after completion.

What if the developer refuses to fix my snags?

For defects covered by the New Homes Quality Code or Building Regulations (structural issues, failed sealed units, ventilation), you have legal grounds to demand repair. For cosmetic defects, your leverage is strongest before completion — once you've moved in, developers become much slower. A documented snagging report is your best evidence.

What is a snagging report worth in pounds?

Based on our inspections, the average new-build flat in London has 40–90 defects. If we apply London contractor rates to a typical snag list, the repair costs total between £3,000 and £12,000. Many buyers negotiate directly with developers using this figure — and recover far more than the cost of the inspection.

What does a Money Report include?

Our Money Report (£399) is a full snagging inspection plus a repair cost estimate for every defect found. Each item is costed using current London contractor rates — so you know exactly what your snag list is worth. This is the report to use if you're negotiating with a developer or making a formal complaint.

Can I use repair costs to get a price reduction from the developer?

Yes — and it works. A documented report showing that the developer owes you £8,000 in remedial work is a powerful negotiating tool. We have seen buyers use Money Reports to secure cash compensation, extended warranties, or commitments to remediate before completion. The developer's alternative is a formal complaint or legal action.

How accurate are your repair cost estimates?

We use current London contractor rates, updated regularly. Prices vary by borough and contractor — our estimates are mid-market for London. They are designed to be defensible in a formal complaint, not worst-case or best-case figures.

Know your numbers

Book before your completion date

Your leverage is highest before you complete. Once you sign, the developer's obligation to fix defects starts shrinking. A costed report before completion is your strongest tool.

Report in 24 hours · Full refund if we cancel · No sales calls